This project will include the removal of existing Carnahan Wastewater Pump Station #22 and installation of a new gravity main sewer system. The project is north of SE 29th Street to SE 28th Court, and east of SE Golden Ave.
For more information, please call Zach Stueve, city wastewater engineer, at 785-368-3122.
T-291057.00 Ash Street Pump Station Force Main Replacement
Project consists of the construction and installation of all required upgrades to the existing pumps, gates, valves, instrumentation and controls, as well as a new force main, to the existing sanitary pump station located at 545 NE Lake St.
For more information please call Michelle Neiswender, City Wastewater Engineer at 785-368-4251.
Call 368-1642 for Zoom login information
Agenda
Approve the 2020-2021 ADA Advisory Council Report and Presentation to the Governing Body scheduled for
April 19